10 units of Aeolos-V 5kW were installed in Dubai, United Arab Emirates in 2021. There are grid-on systems with 12m monopole towers. Aeolos make the special treatment to protect the wind turbine from rust due to the high humidity and salt spray. It is the public government tender project and it is also the pilot and first wind turbine project in Dubai.
During the night, warm wind blows, wind turbines run, and some people sit or lie on the lawn in front of the buiding, some people sit on the shore to enjoy their lives. With the background of Meteor shower light show on the building, the wind turbine looks very beautiful.