Aeolos-V 5kW was installed on the roof of the building in Netherlands. It works with 10kW solar panels to build the hybrid renewable system which helps to reduce the 50% of the electricity cost for this workshop. It has become one of the hot trends to optimize the clean energy. The wind turbine on the rooftop could save the space and very suitable for the places where have the limited surrounding on the ground.